Operating model development is anticipated in coordination with updated
assessments by the SCRS Albacore Species Group
Performance metrics
and stakeholder engagement will follow SCRS guidelines.
A set of
operational objectives to guide MSE design (Rec. 24‑09):
Stock
status: ≥ 60% probability of remaining in the green quadrant of the Kobe
plot over a 30-year projection.
Safety: ≤ 15% probability of falling
below BLIM at any point in the projection period.
Yield: Maximize
overall catch levels.
Stability: TAC changes between management
periods should not exceed ±20%.
A proposed 3‑year management cycle
for initial implementation.
A provision for revising these objectives
by Panel 3, in consultation with the SCRS Albacore Species Group, with
final objectives to be submitted by 2029.
These objectives define a
transparent decision-making framework for operating models and candidate
MPs during the S‑ALB MSE process.
A provision for revising these
objectives by Panel 3, in consultation with the SCRS Albacore Species
Group, with final objectives to be submitted by 2029.
These
objectives define a transparent decision-making framework for operating
models and candidate MPs during the S‑ALB MSE process.